Projects

Scope of works
Kangaroo Creek Dam Upgrade
2x 1m diameter MSCL pipelines constructed inside the dam wall tunnel and all platform and structural included.
One line done at a time keeping flow to feed the River Torrens.

Client
Bardavcol SA Water

Location
Kangaroo Creek Damn
Paracombe SA

Project duration
12 months


Scope of works
Blackwood PRV Upgrade
MSCL Works

Client
Fulton Hogan / SA Water

Location
Blackwood SA

Project duration
2 months


Scope of works
Fit out of new process plant
Various hoppers
All steam and boiler line work
Stainless steel ducting

Client
Ahrens Group

Location
Murray Bridge SA

Project duration
3 months


Scope of works
Millbrook Landslip and Pipeline Repair
1m diameter MSCL fittings and pipeline work

Client
Bardavcol / SA Water

Location
Millbrook SA

Project duration
1.5 months


Scope of works
Orange Pipe line various size pipe and joints mainly 600dia MSCL
Various welded sections for water infrastructure

Client
Leed Construction and engineering

Location
Orange NSW

Project duration
3 months


march_2013_119___copy-159

Scope of works
Geehi river aqueduct replacement
2KM’s of 2 meter diameter MSCL pipe up and down mountain access roads
for water infrastructure

Client
Leed construction and engineering

Location
Geehi NSW

Project duration
6 months


img_6406

Scope of works
Warren reservoir pipeline tie ins 600dia and 350dia MSCL pipe works
For water infrastructure

Client
Leed construction and engineering

Location
Warren reservoir SA

Project duration
1.5 months


img_5564-184

Scope of works
ADCHEM heat exchanger Project all structural steel and pipe works Tie-ins carried out during select shutdowns to not effect Plant production

Client
ADCHEM Australia

Location
Burra SA

Project duration
2 months


img_6020-189

Scope of works
Renmark Irrigation trust all Stainless steel infrastructure, to line up with the clients shut down, all pipe rolled in-house pipe 1 meter diameter and 1.2 meter diameter.

Client
Exact mining and Lams joint venture

Location
Renmark SA

Project duration
2 months


img_5876-176

Scope of works
Various MSCL pipework for the sunrayshia modernisation project 2 meter diameter pipe

Client
Leed construction and engineering

Location
Mildura VIC

Project duration
2 months


img_7466

Scope of works
CMV farms stainless steel manifolds for their pump stations

Client
Exact mining

Location
Loxton SA

Project duration
2 months