Projects
Scope of works
Kangaroo Creek Dam Upgrade
2x 1m diameter MSCL pipelines constructed inside the dam wall tunnel and all platform and structural included.
One line done at a time keeping flow to feed the River Torrens.
Client
Bardavcol SA Water
Location
Kangaroo Creek Damn
Paracombe SA
Project duration
12 months
Scope of works
Blackwood PRV Upgrade
MSCL Works
Client
Fulton Hogan / SA Water
Location
Blackwood SA
Project duration
2 months
Scope of works
Fit out of new process plant
Various hoppers
All steam and boiler line work
Stainless steel ducting
Client
Ahrens Group
Location
Murray Bridge SA
Project duration
3 months
Scope of works
Millbrook Landslip and Pipeline Repair
1m diameter MSCL fittings and pipeline work
Client
Bardavcol / SA Water
Location
Millbrook SA
Project duration
1.5 months
Scope of works
Orange Pipe line various size pipe and joints mainly 600dia MSCL
Various welded sections for water infrastructure
Client
Leed Construction and engineering
Location
Orange NSW
Project duration
3 months
Scope of works
Geehi river aqueduct replacement
2KM’s of 2 meter diameter MSCL pipe up and down mountain access roads
for water infrastructure
Client
Leed construction and engineering
Location
Geehi NSW
Project duration
6 months
Scope of works
Warren reservoir pipeline tie ins 600dia and 350dia MSCL pipe works
For water infrastructure
Client
Leed construction and engineering
Location
Warren reservoir SA
Project duration
1.5 months
Scope of works
ADCHEM heat exchanger Project all structural steel and pipe works Tie-ins carried out during select shutdowns to not effect Plant production
Client
ADCHEM Australia
Location
Burra SA
Project duration
2 months
Scope of works
Renmark Irrigation trust all Stainless steel infrastructure, to line up with the clients shut down, all pipe rolled in-house pipe 1 meter diameter and 1.2 meter diameter.
Client
Exact mining and Lams joint venture
Location
Renmark SA
Project duration
2 months
Scope of works
Various MSCL pipework for the sunrayshia modernisation project 2 meter diameter pipe
Client
Leed construction and engineering
Location
Mildura VIC
Project duration
2 months